NEW QUESTION # 127
In new construction, what is the percentage of pay phones that must be equipped with volume controls?

  • A. 0
  • B. 1
  • C. 2
  • D. 3
  • E. 4

Answer: A


NEW QUESTION # 128
For a six story building (plus a basement) each of the six floors has a useable area of =3716 m2 (40.000 ft2) There are two riser systems, each serving halt of the useable area on each Moor What are the sleeves quantity and configuration required from fifth floor to sixth floor?

  • A. Three sleeves
  • B. Five sleeves
  • C. Four sleeves
  • D. Two sleeves

Answer: B


NEW QUESTION # 129
What is the MINIMUM fire rating for telecommunications spaces walls and wall linings, if not specified otherwise by local Authority Having Jurisdiction (AHJ)?

  • A. Three hours
  • B. One hour
  • C. No minimum requirement
  • D. Two hours

Answer: D


NEW QUESTION # 130
An IT-related program has a critical team in a region experiencing a crisis. Due to uncertainty about the region's changing environment a company's senior leadership asks the program manager to decrease dependencies on the critical team that should the program manager do to mitigate the Impacts of this request?

  • A. Meet with the steering committee to request assistance and influence in obtaining additional resources
  • B. Revisit the program management plan to clearly identify how decreasing critical team dependencies will impact component projects
  • C. Level resources, and empower the critical team to complete its work before regional instability impacts its efforts
  • D. Update the procurement management plan, and begin the request for proposal (RFP) process to replace the critical team by staff augmentation

Answer: B


NEW QUESTION # 131
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR's should be terminated at the

  • A. TR
  • B. IC (BD).
  • C. HC (FD).
  • D. MC (CD)

Answer: D


NEW QUESTION # 132
A component protect of a multiyear program delivers all expected products and services as anticipated. The component project manager obtains approvals from the stakeholders and transitions the benefits to operations What should the program manager do next?

  • A. Verify that the benefits were delivered and authorize component project closure
  • B. Reassign the component project manager to another component project or activity
  • C. Keep the component project open until the program benefits are realized
  • D. Conduct a program audit to confirm that the component protect is complete

Answer: B


NEW QUESTION # 133
Which of the following terms is often used to describe two parallel paths that have identical conductive terminations to two separate grounding reference points?

  • A. Inductive loop
  • B. Ground loop
  • C. Conductive loop
  • D. Capacitive loop
  • E. Resistive loop

Answer: B


NEW QUESTION # 134
Which of the following team members is responsible for ensuring compliance with me contract documents (CDP

  • A. lCT Distribution Designer
  • B. Construction Manager (CM)
  • C. Owner
  • D. Architect

Answer: A


NEW QUESTION # 135
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)

  • A. Ensure the construction materials are stored properly and protected from theft.
  • B. Verify that the overall physical security design complies with the owner expectations.
  • C. Coordinate electrical supply so it is available in advance of the starting of contractor work.
  • D. Assist in the resolution of unforeseen conditions, change orders RFIs and changes to the project's critical path.
  • E. Discuss design concerns with inspectors. AHJs, and other stakeholders.

Answer: A,D


NEW QUESTION # 136
The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?

  • A. =3716 m2 (40,001 ft2)
  • B. =1858m2 (20,001 ft2)
  • C. =929 m2 (10,001 ft2)
  • D. =4645 m2 (50,001 ft2)

Answer: A


NEW QUESTION # 137
What step can be a phase of the Bidding and Negotiating process?

  • A. Creating a response evaluation
  • B. Identifying potential value engineering opportunities
  • C. Prepare necessary change orders
  • D. Identifying any conflicts that may become apparent

Answer: A


NEW QUESTION # 138
During the program execution stage the component project manager responsible for testing estimates that budgeted hours may exceed 200 hours. What should the program manager do?

  • A. Request that the project manager make the team members work additional hours and not bill the protect
  • B. Talk with the project manager and find ways to reduce hours in another part of the project
  • C. Determine which component protects have excess capacity and rebalance those resources to the project that needs additional hours
  • D. Communicate to the program sponsor regarding the additional estimated cost and request a change order

Answer: B


NEW QUESTION # 139
Open RFI's should be reviewed on a _________basis.

  • A. bi-weekly
  • B. weekly
  • C. daily
  • D. bi-monthly

Answer: B


NEW QUESTION # 140
Which two of the following are ADVANTAGES of underground conduit systems? (Select two options.)

  • A. Require more installation time than aerial or direct-buried installations
  • B. Not adaptable for future facility placement or removal without disturbing the property
  • C. Route planning is not as critical as aerial or direct-burial
  • D. Economical over a long life
  • E. Provide additional physical cable protection

Answer: D,E


NEW QUESTION # 141
What should a program manager do to ensure that the program meets the organization's strategic goals?

  • A. Assess the program reports
  • B. Engage the program steering committee
  • C. Analyze the benefits management plan
  • D. Manage the program delivery phase

Answer: C


NEW QUESTION # 142
During the design phase, drawings for ICT communications spaces should be reviewed for Standards compliance and

  • A. equipment availability
  • B. client requirements
  • C. cost projections.
    B OSHA specifications

Answer: A


NEW QUESTION # 143
What's the RECOMMENDED twisted pair cable slack length to be left at the work area outlet location to enable the possibility of future changes in the Horizontal Cabling System?

  • A. =0.3 m (1 ft)
  • B. = 5m (16 40 ft)
  • C. =1 m (3 ft)
  • D. =0.152 m (0.5 ft)

Answer: A


NEW QUESTION # 144
A program manager initiates a developmental program. Significant resources and funding are required (or early activities until the program cost and budget estimates are complete What should the program manager do to understand the financial environment?

  • A. Obtain intermediate funding from the executive sponsor
  • B. Establish program financial framework
  • C. Map costs to the expected benefits realization
  • D. Establish intermediate budget based on historical information

Answer: B


NEW QUESTION # 145
......